Las Fitas Dam - Huesca
Date: 2009/10.
Type of work: Civil Work
Project for the integral regulation and modernisation of the Terreu canal, in the Alto Aragon irrigation system in Huesca. The work includes heightening 10 km of the Terreu canal and improving drainage systems and service roads. The main structure is the construction of the Las Fitas dam. Currently the gallery of the drain at the base of the dam is being constructed. This gallery is 150 m long made in 10 m linear sections. In addition, every section is concreted twice, the fi rst time where the side walls of the gallery are fi lled with Alisply Walls and the second in which the roof is formed. The roof formwork is made with a 14.4 m linear carriage using the AR-80 Shoring System, Multiform and Alisply Circular. It is moved in modules of 4.8m and by means of 8 shoring transport carriages, achieving the form removal, movement, cleaning and positioning at the elevation for the following 14.4 m section in one day.At the same time, the spillway is being built. This has been carried out with Alisply Straight for the side walls and Alumecano for the upper slabs in places where the spillway is underground.Alsina has also studied the outlet tower with Vistaform and the C-160 Climbing Platform and will execute it once the gallery of the drain at the base is finished.
Alsina systems:
Alumecano,
Alisply circular,
Alisply walls,
C-160 climbing platform,
Multiform,
Vistaform slabs